Today, 26/8 we fitted the Foilboard polystyrene on the van’s floor and also started with the installation of the 9 mm marine plywood.
We used the old floor as a template which has to be adjusted due to a different position to the original floor which has the provision for the wheelchair lifter.
The Tasmanian weather was on our side so we managed to finish with the insulation and cut the two large pieces of plywood.